Branco Enterprises Inc.

Changing the Landscape • Springfield & Neosho Missouri

  • Home
  • Branco Built
  • About Branco
    • Services & Capabilities
    • Safety
    • Carpentry Apprenticeship Program
    • Branco Partners
    • Testimonials
    • FAQ
    • Blog
  • Careers
  • Contact
    • Subcontractor
  • Employee Login

Sibley Municipal Pool

sibley waterpark with lots of people playing in the pool area the pool, slide and play area the sibley waterpark pool and slide area the sibley waterpark prior to opening filled pool at the sibley aquatic waterpark a play whale and frog stool in the small children area of the pool the sibley waterpark being constructed the sibley waterpark with the pool and walkways finished the empty pool area during construction

Sibley Municipal Pool

Location: Sibley, Iowa
Architect / Engineer:

Water’s Edge Aquatic Design

Originally opened in 1956, the Sibley Municipal Pool has undergone improvements and renovations in the ’80s and ’90s. However, this idyllic spot received a major facelift in 2018. The existing facility was losing water daily, as the concrete structure had begun to fail. The City had clear goals in mind- keep the existing pool structure, but stop water loss. Several new water features were also on the agenda.

In the summer of 2017, Waters Edge Aquatic Design began its evaluation of the facility. Concept planning followed close behind that fall, with a funding vote passed by Sibley’s residents in November 2017. The existing pool presented an issue for barefoot traffic. In the summer of 2017, Waters Edge Aquatic Design began the evaluation of the facility. Concept planning followed close behind that fall, with a funding vote passed by Sibley’s residents in November 2017. The existing pool presented an issue for barefoot traffic, as there was an S.S. gutter with an open trough. The gutter was removed and replaced with an improvised style that covered the trough and raised the previously 1’ water level to 4. Branco and Water’s Edge Aquatic Design worked with the city to create a realistic schedule and identified items that needed to be completed prior to winter weather to ensure the project stayed on track. Faced with a tight deadline as winter approached, our field crew did an amazing job getting the work done safely and on schedule to make sure the necessary items were completed. An enclosed body waterslide was added as part of facility improvements, as well as a log roll, volleyball net, spray ground that can be operated when the pool is open or closed, and a therapy water jet seat.

Signature Aquatic Features:

  • Zero Depth Entry and Shallow Play Area
  • Water Walk
  • Basketball Goal
  • Climbing Wall
  • Enclosed Body Water Slide
  • Therapy Water Jet Seat
  • Volleyball Net
  • Log Roll
  • Diving Stand
  • Drop Slide

Copyright © 2023 • Branco Enterprises Inc.